期刊文献+

万家寨引黄入晋工程设计洪水计算

Calculating design flood for the Wanjiazhai Diversion Project
下载PDF
导出
摘要 引黄工程跨沟建筑物断面无实测洪水资料 ,其设计洪水采用暴雨法、历史洪水调查和邻近地区水文站设计洪水综合分析确定。历史洪水调查和邻近地区水文站设计洪水的地区综合对提高设计洪水的合理性和可靠性有重要作用。 There are no measured flood data at the sites cross gulies'buildings.The design floods were determined based on regional synthesizing of storm flood calculation,historical floods investigation and design floods calculation of nearby hydrology stations.The historical floods investigation and regional synthesizing of design floods at nearby hydrology stations are very important to increase the reliability and reasonability of the design floods.
出处 《水利水电工程设计》 2001年第2期16-18,52,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 设计洪水 万家寨引黄入晋工程 水文站 可靠性 design flood,calculation,the Wanjiazhai Diversion Project.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部