摘要
我们在以往研究大地震余震序列活动过程的基础上 ,根据“八五”和“九五”以来较新的地震学分析预报方法 ,对 1 999年 1 1月 2 9日岫岩 5 6级地震序列进行了详细研究。结果认为 ,该地震序列活动过程到 2 0 0 0年 1 0月已经结束 ,其后发生的地震为正常的余震活动。同时 。
On the basis of research on active process of aftershock sequences of great earthquakes,the seismic sequence of M S5 6 earthquake occurred at Xiuyan Haicheng on Nov.29 in 1999 is studied in detail,according to a new seismometric methods developed in the '8th 5' and '9th 5'plan years.The result suggests that the seismic active process of this sequence ends in October of 2000,and the Earthquakes occurred afterwards are normal aftershocks.Meanwhile,a forecast to the seismic activity tendency and seismic risk is given in a certain future period.
出处
《东北地震研究》
2001年第2期8-16,共9页
Seismological Research of Northeast China