期刊文献+

宁波招宝山大桥主梁局部拆除设计及施工控制 被引量:7

Design and Construction Control for the Partial Dismantlement of the Main Girder of Zhaobaoshan Bridge in Ningbo
下载PDF
导出
摘要 介绍了宁波招宝山大桥主桥主梁压溃断裂的计算模拟 ,拆除控制计算 ,断口处主梁加固设计 ,支架设计等内容 。 The establishment of the calculation model of buckling and fracture of the main girder, the controlling calculation for dismantlement, the design for the strengthening of the main girder at fracture and the design of falsework are introduced. The critical controlling points for securing the safety of structures during dismantling are noted.
出处 《桥梁建设》 EI CSCD 北大核心 2001年第3期8-12,共5页 Bridge Construction
关键词 招宝山大桥 斜拉桥 主梁 拆除 施工设计 施工监控 桥梁加固 Zhaobaoshan Bridge in Ningbo cable stayed bridge main girder disassembling construction design construction monitor control bridge reinforcement
  • 相关文献

同被引文献39

引证文献7

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部