介绍天津港主航道扩建工程中通过对边坡及备淤深度的研究及调整 ,节约大量投资,从而提高社会效益和经济效益。
It introduces that in Tianjin Port Main Channel Expansion Project, owing to the study and adjustment of the side slope and surplus water depth concerning siltation, the investment was greatly saved and the social& economic benefits were improved.
出处
《水运工程》
北大核心
2001年第6期27-29,共3页
Port & Waterway Engineering
关键词
天津港
主航道
扩建工程
边坡坡度
备淤深度
调整
设计参数
Tianjin Port
main channel
degree of side slope
surplus water depth concerning siltation
adjust design parameters