阐述秦皇岛32-6油田开发工程进度和费用控制的具体措施,并对做好进度和费用控制工作提出了建议。
The paper introduces the schedule and cost control during the execution of QHD 32 - 6 oil field development in detail. Comments on how to handle such controls are also given.
出处
《中国海上油气(工程)》
2001年第2期57-58,共2页
China Offshore Oil and Gas