摘要
通过对巷道变形破坏的机理分析 ,提出了通过控制巷道实际高度 ,从而控制侧压的观点。通过两年的加固实践 。
By the analysis of the mechanism of deformation and failure of the adit, this paper presents a view which based on the control of the real high of adit, side-pressure is controlled. Two years practice of reinforcing proved that the method is successful and effective.
出处
《西部探矿工程》
CAS
2001年第2期57-58,共2页
West-China Exploration Engineering