摘要
本文以某工程为例 ,对 40 0锤击沉管夯扩桩的成桩及承载机理展开分析 ,提出了夯扩桩设计及施工中应注意的问题。
The mechanisms of pile formation and their load bearing of 400 hammering sunk shaft rammer piles were analyzed.The problems which should be paid attention to in the design and construction of rammer piles were put forward.
出处
《化工矿物与加工》
CAS
北大核心
2001年第6期32-33,28,共3页
Industrial Minerals & Processing