摘要
王村矿 2809二分层工作面煤巷与上分层采空区冒落漏通,漏风量达 310m3/ min。为减少向上分层采空区的漏风,防止浮煤自燃,应用聚氨酯泡沫材料对该高冒区进行 喷涂堵漏,使该处漏风降低到 19. 2m3/ min,堵漏效果显著。
The roadway is connected with gob of the upper slice in No.2809 face of Wangcun Coal Mine as a result of roadway roof fall and the a mount of leaked air is up to 310m3/min. In order to decrease air leakage toward gob of the upper slice and prevent self combustion of float coal, urethane foam is sprayed into the area of roadway roof fall and the air leakage is thus droppe d to 19.2m3/min., so the effect of air leakage blocking is outstanding.
出处
《矿业安全与环保》
2001年第3期33-34,共2页
Mining Safety & Environmental Protection