摘要
针对老纺织厂为适应新的工艺流程和设备布置的要求 ,在对原有厂房进行局部改造中如何处理主要建筑结构构件的施工方法进行有益的探讨 。
According to the requirements suited the new process and equipment arrangement of the old textile mill,they made a valuable exploration about the construction way of how to handle the main building structure members in the partial reformation of old factory building.The paper introduced the construction way—the concrete jetting in more detail.
出处
《黑龙江纺织》
2001年第2期54-54,F003,共2页
Heilongjiang Textiles