240m跨拱桥钢管混凝土施工 被引量:7

Steel Pipe Concrete Construction in A 240m Span Arched Bridge Project
下载PDF
导出
摘要 介绍了在高温、混凝土运距远、技术难度高的情况下 ,一次性泵送顶升压注完成了武汉江汉五桥 2 40m跨的拱桥钢管混凝土的施工过程 ,测定了在密封条件下混凝土的早期膨胀率和强度的发展规律 ,详细记录了泵送压力的变化过程。 In this article, authors introduce the construction procedure of steel pipe concrete of Wuhan Jianghan No.5 Arched Bridge whose span is 240m. This construction procedure was finished with once pumping, jacking and pressed pouring under the situation of high temperature, long distance transportation and high technical difficulty. Authors measured the development rules of concrete early stage expansion rate and strength under sealed situation, and also recorded the change procedure of pumping pressure.
出处 《施工技术》 CAS 北大核心 2001年第5期25-26,共2页 Construction Technology
关键词 拱桥 钢管混凝土 泵送 顶升压注 施工方法 concrete arched bridge steel pipe concrete concrete pumping jacking and pressed pouring construction method
  • 相关文献

同被引文献60

引证文献7

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部