期刊文献+

模糊技术在工程项目报价中的应用 被引量:1

The application of the fuzzy technology to the price of the project
下载PDF
导出
摘要 投标报价是一个斗智的过程 ,报价高则拿不到合同 ,还浪费投标所用去的时间、人力、财力 ;报价低 ,虽然拿到了合同 ,却把“钱留在了谈判桌上”.一个好的报价 ,必须经几种方法量化计算 ,反复比较 .本文引进模糊相似优先比关系数学模型 ,并提出了它在预测工程项目投标报价中的运用 ,进行了实例示范演算 。 Bidding is a tricky process. If his bid is too high, he fails to get the contract and loses the time and money spent on preparing the proposal. When he bids much lower than his rivals, he obtains the contract, but he 'leaves money on the table'. A good bid had to compare with more ways. In this paper not only the price of the international project is forecasted with the Fuzzy Similar-priority Comparison, but also a practice example is showed.
作者 王顺洪
出处 《西安建筑科技大学学报(自然科学版)》 CSCD 2001年第2期162-165,共4页 Journal of Xi'an University of Architecture & Technology(Natural Science Edition)
关键词 工程管理 模糊技术 投标 报价 engineering management fuzzy technology bid offer in a bid
  • 相关文献

参考文献3

  • 1徐扬.模糊系统与专家系统[M].成都:西南交通大学出版社,1989..
  • 2徐扬.不确定性推理[M].成都:西南交通大学出版社,1996..
  • 3龙爱翔.工程项目投票的报价决策[J].系统工程,1996,(6):31-35.

共引文献1

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部