摘要
介绍了人民大会堂山西厅装饰改造工程的施工情况 ,简述了改造方案的指导思想、使用的主要材料 ,阐述了总施工进度计划的编制 ,并根据进度计划安排、组织、部署 ,进行施工。将天棚、墙面作为主要工序 ,地面次之 ,最后其它附属房 ,即前期 ,电、风、水、木、焊 ;中期 ,木工和石材 ;后期 ,木工、油漆、彩绘。工种进出合理 ,安排有序 ,以最短的工期 ,最好的质量取得了预期的效果。
In this paper, the writer introduces constructional situation of decorative reformation in Shanxi hall of the Great Hall of the People, sketches guiding ideology of reformation planning, main materials used, separately recounts how to workout overall construction schedule, according to schedule arranges, organizes, maps out and constructs. Ceiling and wall space are regarded as a main procedure, floor is regarded as a secondary procedure, the else outbuildings are regarded as a final procedure. Early days are electric, wind, water, wood and weld, medium term is woodwork and stone, later stage is woodwork, paint and colour decoration. Turnover of kinds of work is rational, arrangement of kinds of work is order. We achieve the desired results by the most short time limit for the project and the best quality.
出处
《山西建筑》
2001年第3期63-64,共2页
Shanxi Architecture
关键词
建筑装饰
施工组织
施工工艺
人民大会堂
decorative reformation, organizing construction, constructional technology