摘要
采用非线性优化方法中的序列二次规划法 (SQP)优化碾压混凝土重力坝坝体体型 .此方法能考虑碾压混凝土重力坝材料分区问题 ,采用更多变量的组合 ,进行断面优化设计 .计算实例表明 ,在满足设计安全的前提下 ,能降低断面单宽造价 ,获得经济。
Sequential quadratic programming(SQP)method, one of nonlinear optimization methods, is adopted to optimize section configuration of roller_compacted concrete(RCC) gravity dams. The material distribution of RCC gravity dams and combination of more optimizing variables are considered in the process of optimizing. The computation result of the project example based on the method shows that the optimization design program can decrease efficiently cost per unit width of RCC gravity dam body and gain structurally efficient and economical section configuration.
出处
《武汉水利电力大学学报》
EI
CSCD
2000年第6期29-33,共5页
Engineering Journal of Wuhan University
基金
"九五"国家重点科技攻关项目 !(96 - 2 2 0 - 0 1- 0 1- 0 1)
关键词
碾压混凝土重力坝
坝体
体型优化
非线性
RCC gravity dam
optimization of section configuration
nonlinear optimization methods
SQP method