期刊文献+

再分析卡里巴拱坝下游河床冲刷严重的原因 被引量:3

Re-considering reason of serious scour produced in Kariba Dam
下载PDF
导出
摘要 卡里巴 (Kariba)拱坝下游河床冲深达 5 7~ 80m ,是世界上河床冲刷最为严重的拱坝 ,有着其地质、泄水布置等方面的原因。其中主要原因是泄水中孔出口佛劳德数较低 ,6股水舌入水后能量聚集 ,同时河床又未采取保护措施。总结其经验可避免类似冲刷在我国出现 ,对小湾、溪落渡等高拱坝护坡不护底水垫塘的论证有着重要意义 。 Scour depth in Kariba Dam reaches 57 [similar to] 80 m. This is the most serious one in the world. There are many reasons in the aspects of the geology and the arrangement of the outlets. The primary causes generating scour are that the Froude numbers of releasing outlets are relatively low, the energy of 6 nappes entering downstream water body is highly concentrated, meanwhile, there was no any bed protection measure. Summing-up the experience can avoid the similar serious scours in China. This is significant for demonstrating the feasibility of water cushion pool without bottom lining but with protecting both bank slopes in Xiaowan and Xiluodu Projects. And it can be also used as a reference for other water projects.
机构地区 水电工程系
出处 《长江科学院院报》 EI CSCD 北大核心 2001年第4期3-6,共4页 Journal of Changjiang River Scientific Research Institute
基金 国家"九五"重点科技攻关资助项目 (96 2 2 1 0 5 0 1 0 2 )
关键词 高拱坝 水垫塘 基岩 冲刷平衡深度 Kariba high arch dam large discharge water cushion pool foundation rock equilibrated scour depth
  • 相关文献

参考文献3

  • 1水电规划设计总院 中国水力发电工程学会 等.水电高水头泄水建筑物收缩式消能工[M].北京:中国农业科技出版社,2000..
  • 2水电规划设计总院,水电高水头泄水建筑物收缩式消能工,2000年
  • 3刘曼玲,全国高水头泄水建筑物水力学问题论文集,1987年

同被引文献15

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部