摘要
使用变形速率、国家标准、工程经验等方法 ,对不同监测仪器建立不同监控指标。通过设计、施工、监测三大环节 ,建立闭循环系统 。
By using the methods of deformation rate,state specified criterion and engineering experience,the different controlling indexes are given for different monitoring instrunments.Through three links of design,construction and monitoring,a closed cycle system is set up for the monitoring of stability of high slope of Three Gorges Prject permanent lock.
出处
《长江科学院院报》
CSCD
北大核心
2001年第4期32-35,47,共5页
Journal of Changjiang River Scientific Research Institute
基金
国家自然科学基金资助项目 (5 96 790 2 0 )
关键词
岩体
边坡
安全监控
三峡永久船闸
slope of rock mass
safety monitoring
monitoring controlling index
closed cycle
TGP permanent lock