摘要
通过对盐田港区二期工程的监理 。
The several problems occurring during driving steel pile for wharf were analyzed and inquired through the supervision for Phase Two Project of Yantian Harbour Area.
出处
《港工技术》
北大核心
2001年第2期36-39,共4页
Port Engineering Technology
关键词
盐田港区二期工程
沉桩
贯入度
桩偏位
码头
钢管桩
打桩