摘要
指出尾砂单管胶固充填是以具有高水、速凝、早强特性的“全水胶固材料”作胶结料的尾砂胶结充填新工艺。详细介绍了该充填新材料和工艺的特点、主要技术参数。
Indicates that the cemented tailing backfilling with single pipe is a new technology in cemented tailing backfilling using“water-bearing cemented materials”of high water content,rapid hardening,and high-early strength.Details the characteristics of filling materials and process technology,main technical parameters,commercial testing and actual application.
出处
《有色金属设计》
2001年第2期1-3,共3页
Nonferrous Metals Design
关键词
尾砂
单管胶固充填
全水胶固材料
金矿床
采矿
tailing
single-pipe cemented backfilling
water-bearing cemented materials