摘要
介绍了湘钢二炼钢转炉车间基础方案选择和基础的设计与施工 ,着重讨论了本工程中桩基的特点和施工中遇到的问题。由于设计有所突破 ,不仅节省桩基投资约 3 2万元 ,还缩短了工期 1个半月左右 ,其质量也得到保证。
A selecting of foundation scheme, designing and constructing were introduced. On the foundation would be building the BOF plant of the xianggang. Some speciality and problems of the foundaction designing and coustructing were discussed. Owing to the design breakthrough, the engineering invest decreases about 320,000 yuan, and the coustruction term were moved up about 1 5 month, the foundation quality is better.
出处
《湖南冶金》
2001年第3期30-33,共4页
Hunan Metallurgy