摘要
在大型水利工程的施工中 ,由于工期长、规模大、技术含量高等原因 ,不可避免地会发生索赔事件。
The claim often occurs inevitably in the construction of the large water project because of the long construction, large scale, high technologic difficulty and so on. In this paper, the claim events occurred in the construction of the International Bid Ⅰ of the YRDP are taken as the example, the causes and estimation of the chaim are discussed.
出处
《山西水利科技》
2001年第3期55-56,共2页
Shanxi Hydrotechnics