摘要
由于晋城给水工程已不能满足现状及 2 0 0 5年需水量要求 ,需进行二期给水工程的设计。对晋城主城区二期给水工程可供利用的水源———岩溶水 ,郭壁泉水及二者的关系进行了分析 ,提出了岩溶水资源的优化开采作用 ,制做了优化模型 ,寻找出约束条件 ,并对优化模型进行求解 。
Because Jincheng water?supply engineering can't su ffice nowaday status and water amount required in the year of 2005, it is necessary to carry out the 2nd periodical water?supply engineering design. The writer analyses the availa ble water sources?karst water, Guobi fountain and their relationship, putting forward the optimization a pplication of the karst water resource. Also the paper introduces the optimizati on model, the restriction condition and the water?supply resource plan in the a spect of the hydro?geological condition and the source protection.
出处
《山西建筑》
2001年第4期159-160,共2页
Shanxi Architecture
关键词
给水工程
供水水源
岩溶水
方案确定
water-supply engineering
water-supply source
karst water
plan decision