摘要
介绍在漳州后石电厂取水口工程投标中,中港第四航务工程局二公司与中交第四航务工程勘察设计院联合提出替代方案,取替原设计方案,成为正式施工方案。
During tendering for the water intake works for Zhangzhou Houshi Power Plant, the Second Engineering Company of the Fourth Harbour Engineering Bureau under CHEC and China Communications the Fourth Investigation &Design Institute for Navigational Engineering jointly made an alternative proposal to substitute for the original one, which was finally accepted as the formal construction scheme.