摘要
评述目前港口建设项目财务评价中采用的财务基准收益率取值存在的问题及影响,提出重新测定该值的必要性和建议。
The problems existed in determination of the value of financial standard rate of return. currently adopted for financial evaluation of port construction project and its influence are elaborated. The necessity and suggestions on redetermining it are put forward.
出处
《水运工程》
北大核心
2001年第7期33-35,共3页
Port & Waterway Engineering