摘要
洋浦港二期工程东接一期码头 ,西邻洋浦村居民区 ,爆夯施工安全问题相当突出。
Yangpu Port Phase II Project is connected to Phase I Project to the east and neighbouring the residential area of Yangpu Village to the west, thus the problem of safety of explosive tamping is quite conspicuous. It introduces selection of explosive tamping parameter through test, the application effect and successful experience.
出处
《水运工程》
北大核心
2001年第9期65-69,共5页
Port & Waterway Engineering