摘要
介绍了长江三峡工程水利枢纽开发的任务和主要效益;枢纽布置与主要水工建筑物;施工规划及工期;工程建设进展及现状;三峡建设涉及的几个岩石力学研究问题。
The main tasks and principal benefits of the Yangtze Three Gorges Project, the project layout and main hydraulic structures, the construction planning and scheduling, the implementation and recent progress of construction and several rock mechanics problems involved in the construction are introduced.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2001年第5期597-602,共6页
Chinese Journal of Rock Mechanics and Engineering