摘要
本文分析了二分厂一工段12m^3聚合釜挂胶严重、清釜周期短的原因,阐述了该釜进行改造的必要性。
The causes of serious stickiness of the content on the wall occurred in the 12 M2 polymarization vessel was analyzed in this article. At the same time,the necessity of the renovation of this vessel was stated.
出处
《化工设备与管道》
CAS
2001年第3期22-25,共4页
Process Equipment & Piping
关键词
聚合釜
设计条件
结构
技术改造
挂胶
传热
清釜
polymarization vessel,design condition,structure,compari-son,renovation