期刊文献+

两台主变零序保护误动分析

Analysis on maloperation of zero sequence protections for two main transformers
下载PDF
导出
摘要 2 0 0 0年 7月 12日舟山电网定海电厂检查WXH 11x线路微机保护的开口三角电压极性工作中 ,由于主变零序保护元件触点误接 ,因试验需要 ,接线更改后造成定海电厂 4#、5 #主变零序保护误动作 ,引起定海电厂与舟山电网解列 ,分析原因 ,以期对类似工作有所借鉴。 On July 12, 2000, a routine maintenance on opened △ voltage polarity in WXH-11x microprocessor based transmission line protection was done in Dinghai Power Plant in Zhoushan Power Network and a wrong wiring of zero sequence protection element for main transformer was found. For testing, the wiring was corrected but caused the maloperation of the protections for #4 and #5 main transformers and therefore brought the Dinghai Power Plant into insulation from Zhoushan Power Network. The causes are analyzed and it will be helpful to the future work.
作者 俞恩科
出处 《继电器》 CSCD 北大核心 2001年第7期59-60,共2页 Relay
关键词 零序保护 误动 微机保护 元件保护 继电保护 变压器 电网 wrong wiring maloperation zero sequence protections for main transformers insulated
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部