期刊文献+

淮河采矿塌陷区河堤渗透稳定性数值分析 被引量:2

Numerical analyses of dyke seepage-stability in mining subsided area across Huaihe River
下载PDF
导出
摘要 根据场地地层基本物理特性 ,采用非均质各向异性稳定渗流模型对李嘴孜矿区淮河大堤正常堤段和采矿塌陷堤段的渗流状况进行流场条件概化 ,采用有限元数值计算方法对洪水期高水位条件下的河堤渗流进行了模拟求解 ,给出河堤各部位渗透速度和水头梯度的分布 ;在此基础上 ,进行了河堤危险部位渗透稳定性分析计算 ,作出两种堤段均不会发生渗透破坏的基本结论。 Based on the analysis of the physical features of site beds, an inhomogeneous and anisotropic steady seepage model is applied to analyze the dyke seepage of Huaihe River during flood periods in both normal segment and the one within subsided section due to underground mining.The finite element modeling method is adopted. With the analytic calculation, the seepage stability of each dyke segment is assessed,and it is considered that the two segments will remain stable.
作者 葛晓光
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 2001年第4期578-582,共5页 Journal of Hefei University of Technology:Natural Science
关键词 河堤 渗透稳定性 有限元法 淮河 采矿塌陷区 沉降过程函数 dyke seepage stability finite element method Huaihe River
  • 相关文献

参考文献8

  • 1《工程地质手册》编写委员会.工程地质手册(第三版)[M].北京:中国建筑工业出版社,1992..
  • 2贝尔J.多孔介质流体动力学[M].北京:中国建筑工业出版社,1983..
  • 3陈建生,李兴文,赵维炳.堤防管涌产生集中渗漏通道机理与探测方法研究[J].水利学报,2000,31(9):48-54. 被引量:75
  • 4钱家欢,土工原理与计算(第2版),1996年,155页
  • 5《工程地质手册》编写委员会,工程地质手册(第3版),1992年,944页
  • 6华东水利学院,水工设计手册.3,1984年,248页
  • 7李竞生(译),多孔介质流体动力学,1983年,206页
  • 8孙讷正,地下水流的数学模型和数值方法,1981年,195页

二级参考文献4

共引文献118

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部