针对开拓方案选择中损失资源的计价问题作了分析 ,选择现值法计算矿产资源价值的基础上 。
The article analyses the valuation problem of resources loss that lies in the choice of development plan. It choose the present value method to calculate the value of mineral resources, and on this basis, it present the calculation method of resources loss and calculation approach of economic loss resulting from remaining bracket pillar.
出处
《有色矿冶》
2001年第4期4-6,共3页
Non-Ferrous Mining and Metallurgy
关键词
开拓方案选择
现值法
资源损失
价值计算
采矿
choice of development plan
present value method
resources
calculation of value