摘要
介绍了竖井施工中有关基坑排水、混凝土浇筑以及侧壁模板等设计问题。
In this paper, designs for foundation pit drainage, concrete pouring as well as side wall form, etc in shaft well construction are discussed.
出处
《广西交通科技》
2001年第1期55-56,共2页
Guangxi Communication Science & Technology