摘要
阐述了送变电施工企业同时兼营送变电工程的运行及维修的可行性和必要性 ,从政策上以及区内外的实践上等五个方面进行了分析探讨 ,并提出了建议。
This paper states the feasibility and necessity for a transmission and transformation company to run and maintain a power transmission project The analysis is made from five points of view such as policy and the practice, based on which suggestions are put forward
出处
《广西电力工程》
2001年第2期4-5,70,共3页
Guangxi Electric Power Engineering