通过对广州造纸厂高压热电站锅炉烟气干式脱硫系统在试运行中所存在的问题进行分析和采取的解决措施 ,为以后的工程建设积累宝贵的实践经验。
The analysis of the problems existing during the commissioning of CDSI desulphurization system in the high pressure thermal power station of Guangzhou paper mill and of the solutions to the problems provides valuable experience to later projects