倒落抱杆整立杆塔最优吊点的确定准则 被引量:2

Principles to Determine the Optimum Hoisting Points for Pole-towers Erected Completely with Inverted Holding Poles
原文传递
导出
摘要 倒落抱杆整立杆塔施工中 ,吊点位置的确定是一项非常重要的设计内容。采用“弯曲应变能最小”准则 ,搜索最优吊点位置 ,可显著降低杆塔最大截面弯矩 ,使之满足杆塔结构强度及抗裂要求。该法适用于任意多吊点、任意荷载、任意变截面等多种情况。 For construction of complete pole-tower with inverted holding poles the determination of hoisting points is a very important design content.Applying the principle of “minimum bending strain energy”to seek for the optimum location of hoisting points can obviously reduce the maximum sectional bending moment,which can meet the requirements for structural strength and anti-crack of pole-towers.The method is suitable for many conditions of optional multiple hoisting points,optional load and optional variable sections.[
出处 《电力建设》 北大核心 2001年第5期18-20,26,共4页 Electric Power Construction
关键词 倒落抱杆 整立杆塔 弯曲应变能量小准则 输电线路 绝缘子 inverted holding poles erection of complete pole-tower optimum hoisting points principle of minimum bending strain energy
  • 相关文献

参考文献1

共引文献2

同被引文献1

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部