摘要
电力自耦变压器在其输入电流均小于额定值时 ,其公共绕组也可能过负荷。从电流分布 ,容量传递的角度分析了这种情况的发生 ,并讨论了与其相关的若干问题。
Whem electric power coupling transformer at input current is less than rated value, public winding can be also overloaded. The situation is analyzed from current distribution and capability transference and discussion on some problems.
出处
《江西电力》
2001年第2期31-34,共4页
Jiangxi Electric Power
关键词
自耦变压器
公共绕组
过负荷
电力变压器
electric power coupling transformer
public winding
overload
overload protection
complex function vector circular map