摘要
论述了工程组织的难点,工程各项目实施阶段的控制。这些控制包括:设计前准备阶段进度控制,设计阶段进度控制,编制施工总进度计划,施工阶段工程进度控制。
Difficult point of organizing construction project and controlling construction stage are discussed. These are the controlling preparation schedule after construction design, the controlling design stage schedule, the editing total construction schedule I controlling constructing sage.
出处
《阴山学刊》
2000年第6期79-81,共3页
Yinshan Academic Journal
关键词
工程组织
进度控制
煤气回收工程
炼钢
organizing construction
construction schedule
construction project of recovering coal gas