摘要
简要介绍了秦山三期(重水堆)核电工程的核反应堆厂房安全壳筒墙滑模工程概况、施工工艺等有关内容。
Perimeter slipforming of the reactor building containment as well as the construction process are briefly presented. It is also of great value to other similar project.
出处
《核科学与工程》
CSCD
北大核心
2001年第2期140-144,共5页
Nuclear Science and Engineering