摘要
CANDU6堆调试期间的物理启动和物理调试试验主要在B阶段和C阶段进行,同时也包括A阶段的堆芯装料后的临界监督。基于韩国月城4号机组的物理调试,介绍了物理调试试验数据的预模拟分析、试验方法以及试验结果的分析和评估,并指出了试验中的重要注意事项。
Physical startup and physical commissioning test of CANDU 6 during commissioning are primarily performed at Phases B and C, and critical monitoring after fuel loading at PHASE A is also included. Based on physical commissioning of Wolsong Unit 4 of Korea, the pre-modeling analysis, test method as well as analysis & evaluation of the test results of the physical commissioning test data, indicating the points for attention during testing are presented.
出处
《核科学与工程》
CSCD
北大核心
2001年第2期166-175,共10页
Nuclear Science and Engineering