摘要
介绍了济宁二号矿选煤厂工艺系统存在的问题及改进方案的研究确定情况 ,强调系统改造应有全局观念 ,并应充分考虑对多变的市场的适应性。
The existing technical problems and technological transformation scheme in Jining Coal Mine No.2 coal preparation plant are introduced. The process system should be provided with an overall point of view and considered to suit to the changeable market demand.
出处
《洁净煤技术》
CAS
2001年第2期8-10,共3页
Clean Coal Technology