摘要
针对电厂送风机运行水平不高的现状 ,对煤种、风量调节方式、风机运行台数等影响风机运行效率的各种因素进行了多种工况试验 ,提出了几种优化风机运行的方法。
In view of the inadequate operation situation of forced draft fans in power plants, different factors impaired the operation efficiency of said fans have been discussed, and some methods of operating optimization thereof have been put forward.
出处
《热力发电》
CAS
北大核心
2001年第4期48-49,52,共3页
Thermal Power Generation