摘要
根据原有集散系统的硬件配置 ,充分利用现有的技术力量 ,对新配置的系统进行设计 ,在达到预期效果的同时 。
On the basis of the former Distributed Control System hardware configuration,design is done for the newly configurated system,with sufficient use of the existing technical forces.Expected result is achieved while investment is greatly reduced.
出处
《中氮肥》
2001年第4期49-51,共3页
M-Sized Nitrogenous Fertilizer Progress