期刊文献+

资源管理中资源增量的控制研究 被引量:2

Determining Optimum Increment of Resources In Resource Management
下载PDF
导出
摘要 讨论了在资源管理中如果要增加资源 ,应增加哪种资源 ,应如何考虑资源的价格 。 The shadow price resource can supply resources management. This paper discusses how to determine optimum increment of resources by shadow price.
作者 刘舒燕
出处 《武汉理工大学学报(交通科学与工程版)》 北大核心 2001年第3期303-305,共3页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
关键词 资源管理 资源配置 影子价格 资源增量 控制研究 最优化方法 线性规划 resource management dispose resources shadow price
  • 相关文献

参考文献1

  • 1牛应武.运筹学[M].西安:西安交通大学出版社,1994.57.

共引文献1

同被引文献18

  • 1屈喜龙,孙林夫.遗传算法在制造资源优化配置中的实现[J].华侨大学学报(自然科学版),2005,26(1):93-96. 被引量:5
  • 2熊禾根,李建军,梁培志,杨金堂.模具企业车间作业计划中的关键路径及其求解算法[J].中国机械工程,2006,17(12):1273-1276. 被引量:7
  • 3Sebo T L. A long range production/resource planning system using linear programming [ J ]. Computers and Industrial Engineering, 1986,11 ( 1 - 4 ) : 180 - 183.
  • 4Billington P J, Mcclain J O,Thomas L J. Mathematical programming approaches to capacity constrained MRP systems: review, formulation and problem reduction[ J]. Management Science, 1983,29( 15 ) : 1 126 - 1 141.
  • 5Silva C R N, Morabito R. Performance evaluation and capacity planning in a metallurgical job-shop system using open queueing network models [J].International Journal of Production Research,2009,47 ( 23 ) :6 589 - 6 609.
  • 6Seshadri S, Pinedo M. Optimal allocation of resources in a job shop environment[ J]. IIE Transactions,1999,31 (3):195 -206.
  • 7Arakawa M, Fuyuki M, Inoue I. An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function[ J]. International Journal of Production Economics ,2003 ,g5 ( 3 ) :359 - 369.
  • 8Guo Y W, Li W D, Mileham A R, et al. Applications of particle swarm optimisation in integrated process planning and scheduling [ J ]. Robotics and Computer-integrated Manufacturing,2009,25 ( 2 ) :280 - 288.
  • 9Shahabudeen P,Krishnaiah K, Narayanan M T. Design of a two-card dynamic kanban system using a simulated annealing algorithm[J]. International Journal of Advanced Manufacturing Technology,2003,21 ( 10 - 11 ) :754 - 759.
  • 10Sebo T L. A long range production/resource planning system using linear programming [ J ]. Computers and Industrial Engineering, 1986,11 ( 1 - 4 ) : 180 - 183.

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部