无超载时围护结构水平位移与墙后地表位移关系研究 被引量:2

Study on Relationship of Horizontal Displacement of Supporting Wall and Surface Settlement behind the wall in the deep excavation without Superload
原文传递
导出
摘要 分析了引起基坑围护结构变形的主要因素,以简单位移场及修正的地层补偿法位移场模拟无超载时围护结构水平位移与墙后地表位移的对应关系,并结合上海软土深基坑工程的实践,给出收缩系数及坑周地表位移的表达式。 This paper analyzes the main causes of the deformation of supporting wall and simulates the relationship of horizontal displacement of supporting wall and surface settlement behind the wall without superload by simple displacement field and modified ground compensation displacement field. Contraction coefficient and expression of surface settlement around deep excavation are concluded on the basis of the practices of deep excavation engineering in the soft ground of Shanghai.
出处 《地下工程与隧道》 2001年第3期2-6,共5页 Underground Engineering and Tunnels
  • 相关文献

参考文献2

  • 1杨国伟.深基坑及其邻近建筑保护,同济大学博士学位论文[M].,2000..
  • 2李亚.基坑周围土体位移场的分析与动态控制,同济大学硕士学位论文[M].,1999..

同被引文献13

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部