摘要
介绍了三峡大坝混凝土连续浇筑系统的组成及其控制技术 ,重点叙述Profibus现场总线技术的应用 ,主站与上位监控系统的组成和通讯 ,以及计量输送机的运行、打滑检测和对位。
This paper introduces composition of the continuous concrete casting system for the Three Gorges dam project and the control technologies,focusing on the application of Profibus technology;configuration of main station and monitoring system and the communication between them;and operation,slip detection and alignment of the measuring conveyors.
出处
《起重运输机械》
北大核心
2001年第9期21-23,共3页
Hoisting and Conveying Machinery