摘要
通过对宁夏固海扬水工程各泵站普查结果的分析 ,针对机电设备现状及存在的问题 ,制订了泵站改造总体规划 ,提出了目前工程运行管理的主要任务 ,对工程今后自身建设和充分发挥效益具有重要的指导意义。
By investgateing the pump station of Guhai electric irrigation project, on the basis of actuality and questions about electric equipments, we put forward the total plans for the pump's reconsuation and important job in pump's operation now. The research has important effects on constructing pump station, exerting satisfactory benefits in the future.
出处
《排灌机械》
2001年第5期18-23,共6页
Drainage and Irrigation Machinery
关键词
泵站
改造
扬水工程
调查
Investigation, Reconstruction, Pump station