阳泉二电厂炉水pH值降低原因的试验分析 被引量:2

Experimental Analysis of pH Decrease of Boiler Water at the Yangquan No.2 Power Plant
下载PDF
导出
摘要 通过对阳泉二电厂 1号、 2号机水汽质量进行跟踪监测 ,查出了给水 p H值不低而炉水 p H值降低的原因是由于精处理再生设备存在严重缺陷、精处理混床在线电导率表未正常投运、混床运行中泄漏大量 Cl-,造成炉水 Cl-浓度升高 ,炉水 p H值下降。从机理上对试验现象进行了分析 ,提出了严格控制运行中精处理混床出水电导率、消除精处理再生设备缺陷。 By continuous measurement of water steam quality of No.1 and No.2 generator unit at the Yangquan No 2 power plant,it finds that the pH decreasing in boiler water but without any decreasing in feed water is due to the abnormal performance of in-situ conductivity analyzer and the defect of regenerate condensate polishing device,which led to the leaking of Cl - and then the rising of Cl - in boiler water.As a result,the pH of boiler water decreased.Based on the abave analysis,the best control of running was proposed.
出处 《山西电力》 2001年第5期4-6,共3页 Shanxi Electric Power
关键词 凝结水精处理 PH值 炉水 氯离子 试验分析 电厂 condensate polishing Cl - the pH of boiler water experimental analysis
  • 相关文献

参考文献3

共引文献7

同被引文献2

  • 1周向东.延迟焦化余热锅炉的磷酸盐"隐藏"现象和防治对策.工业水处理技术(第6册).北京:中国石化出版社,2004
  • 2周向东.延迟焦化余热锅炉的磷酸盐"隐藏"现象和防治对策-工业水处理技术[M].北京:中国石化出版社,2004:56-57.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部