摘要
就河坡发电有限责任公司 2 2 0 t/h煤粉炉改循环流化床锅炉的可行性进行了分析 ,从燃烧系统。
The feasibility of transform Hepo Power Plant 220 t/h coal dust boiler into CFB is analysed,initial scheme and imagine of transform is recounted for combustion system and supply air system etc.
出处
《山西电力》
2001年第5期17-19,共3页
Shanxi Electric Power