摘要
仓储式锅炉燃煤发电机组一次风管浓度无法用直接测量的方法获取。本文根据一次风速、一次风温进行模糊判断得出其浓度的百分比 ,在大型锅炉中具有很高的应用价值。
As to coal fired boiler power station stored in a warehouse, density in one off air tube can not be caught through direct measurement. In this paper, the method that the density percentage has been derived according to one off air speed and air temperature to make fuzzy estimation, has great applied significance in large boiler.
出处
《上海海运学院学报》
北大核心
2001年第3期315-316,320,共3页
Journal of Shanghai Maritime University
关键词
模糊判断器
风粉浓度
风管
锅炉
fuzzy estimation enginery, pulverized coal air density, air tube