摘要
针对灵山编组站存在的问题 ,本文介绍了驼峰改造的设计方案及设计思路 ,经具体实施后实践证明 ,其使用效果良好。沈阳铁路局针对目前其管辖范围内既有驼峰的使用情况 ,近几年先后对一些编组站进行了改造 ,而灵山编组站便是其中之一。
Aimed at the problems existed in the Ling Shan marshalling station,this paper intrduces the design plan and design thinking of hump reconstruction which prove that its applying effects are fine after they are carried out in practice in the concret.Aimed at the applying condition of existing humps within the jurisdiction at present of Shen Yang railway administration,some marshalling stations are reconstructed successively in recent years,which Ling Shan marshalling station is one of that reconstructed.