Operation Status of 600kV Cockroft-Walton Accelerator
-
1Yuan Youjin Xia Jiawen Yang Jiancheng Zhao Hongwei Yang Weiqing Yang Yiping HIRFL Operation Group.Accelerator and the Others——Operation Status of HIRFL in 2011[J].IMP & HIRFL Annual Report,2011(1):213-213. 被引量:1
-
2Xianyi, Zhao Limin, Wang Pingzhi and Li Hengyuan.Status Report on 600 kV Cockroft-Walton Accelerator[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2002(1):148-148.
-
3Report on 600kV Cockroft-Walton Accelerator[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2000(1):164-164.
-
4Operation Status of 200kV Heavy Ion Accelerator[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2000(1):163-163.
-
5Zhao Hongwei Xia Jiawen Yuan Youjun Yang Jiancheng Yang Yipin HIRFL Oopertation Group.Accelerator and the Others—Operation Status of HIRFL in 2009[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2009(1):231-231.
-
6Beam Chopper for Nuclear Physics Experiments[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,1999(1):158-158.
-
7FengYucheng Lu Wang Li Jinyu Zhang Wenhui Ma Hongyi Ma Baohua Wang Hui Li Jiaqing Lin Shuhao Cao Yun Sha Shan W u Qi Guo Junwei Fang Xing Yang Yao Li Xixia Zhang Hengjuan Zhao Huanyu Zhang Xuezhen Sun Liangting Zhao Hongwei.6 - 18 Operation Status of On-line Ion Sources in 2012[J].IMP & HIRFL Annual Report,2012(1):261-262. 被引量:1
-
8Yuan Youjin Xia Jiawen Yang Jiancheng Zhao Hongwei Yang Weiqing HIRFL Operation Group.6 Accelerator and the Others&&6 - 1 Operation Status of HIRFL in 2012[J].IMP & HIRFL Annual Report,2012(1):239-239.
-
9Li Jinyu Sun Liangting Wang Pingzhi Song Mingtao Feng Yucheng Wang Hui Ma Baohua Zhu Yuhua Sha Shan Liu Huiping Ma Xinwen Zhao Hongwei.Annual Operation Status of 320 kV HV Platform[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):153-154.
-
10Sun Liangting Zhao Hongwei Zhang Xuezhen Guo Xiaohong Feng Yucheng Li Jinyu Cao Yun Lu Wang Wang Hui Ma Baohua Li Xixia Zhao Huanyu Shang Yong Jin Tao Yuan Pin Song Mingtao Zhan Wenlong Wei Baowen.Annual Operation Status of SECRAL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2007(1):180-181.