摘要
本文在荷载分析和力学验算的基础上 ,对天桥的现浇钢筋混凝土箱梁采用满堂红脚手架钢管支架 ,效果很好。
According to the theoretical calculation results, the full framing was used in the construction of cast in site reinforced concrete box beam of an overbridge on Wulumuqi-Kuitun highway. Constuction practice shows it is suitable.
出处
《结构工程师》
2001年第3期47-48,共2页
Structural Engineers