4White,D. J.,Lehane,B. N.. Fricticn fatigue on displacement piles in sand[J]. Geotechnique,2004,54(10) : 12-13.
5Andrew Jackson. The Setup of Jacked Piles. Fourth-year undergraduate project in Group D, 2006/2007.
6Zhang L M, NG C W W, Chan F, et al. Termination criteria for jacked pile construction and load transfer in weathered soils [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2006, 132 (7): 819 -829.
7Yu F, Yang Y F. Discussion of "Termination criteria for jacked pile construction and load transfer in weathered soils" by L M Zhang, C W W Ng, F Chan and H W Pang [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133 (11): 1477 -1479.
8Fleming, W G K, W K Elson. Pile engineering [ M]. London: John and Sons, 2nd edition, 1992, 118 - 122.
9G W Ellis, C Yao. Stress-strain modeling of sands using artificial neural networks [ J ]. Journal of Geotechnical Engineering, 1995, (5) : 429 -435.